Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Titlesort descending Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Aiya Solar Project (Moapa) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Paused No
Alaska LNG Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress No
Atlantic Coast Pipeline, Atlantic Coast Pipeline Amendment, Supply Header, and ACP-Piedmont Lease Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
Atlantic Sunrise Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress Yes
Boardman to Hemingway Transmission Line Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) In Progress No
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress Yes
Cardinal-Hickory Creek 345 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress No
Chokecherry-Sierra Madre Wind Energy (Phase 1) Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore Complete No
Chokecherry/Sierra Madre Wind, Phase II Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore Paused No
Denbury Riley Ridge to Natrona Project CO2 Department of the Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction Complete No
Desert Quartzite Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress No
East Side Coastal Resiliency Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Energy Gateway South Transmission Project Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Fort Mojave Solar Project (Fort Mojave Tribe) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Cancelled No
Gateway West Segments 8 & 9 Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress Yes
Gordon Butte Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Gulf LNG Liquefaction Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines Complete No
Hudson River Rebuild by Design Project : Resist, Delay, Store, Discharge Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Complete No

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Titlesort descending Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Second Avenue Subway: Phase 2 Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
16th Street Mall Improvements Environmental Assessment Department of Transportation Federal Transit Administration Surface Transportation Public Transportation In Progress No
5/56 Missing Connection States California Surface Transportation Highways Complete No
56th Ave and Pena Boulevard Department of Transportation Federal Highway Administration Surface Transportation Highways Class of Action Changed No
605/Valley Blvd: Interchange Improvement Project States California Surface Transportation Highways In Progress No
67th St Corridor Extension Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
710 Freight Cooridor States California Surface Transportation Highways In Progress No
710 Gap Closure States California Surface Transportation Highways In Progress No
ACEforward Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
Adena Ditch Bridge Replacement on National Trails Highway States California Surface Transportation Bridges Paused No
Albert J Ellis Airport Runway Extension Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
All Aboard Florida: Miami - Orlando Passenger Rail Service Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
American Airlines Campus Redevelopment Project in Fort Worth Texas, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Ames Municipal Airport Installation of Solar Facility, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Amtrak Baltimore and Potomac Tunnel Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
ANC Runway 15/33 Rehabilitation, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Arroyo De La Laguna: Replace/Rehab Bridge for Scour Mitigation, Bridge Rail Upgrade and Seismic Retrofit States California Surface Transportation Highways In Progress No
Assembly Street Railroad Consolidation Project Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
Atlanta - Charlotte Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads In Progress No
Atlanta - Chattanooga High Speed Ground Transportation Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Titlesort descending Lead Agency Bureau/Mode Sector Project Type Status Project Category
Alkali Creek Reservoir Project Department of the Interior Bureau of Land Management Water Resources Irrigation and related water supply projects In Progress MIP Only
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress FAST-41 Covered Projects
Boise River Basin Feasibility Study Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress FAST-41 Covered Projects
Coos Bay, Oregon Section 408/204(f) Channel Modification Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
Crow Creek Pipeline Project Department of Agriculture US Forest Service Pipelines Interstate Natural Gas Pipelines In Progress MIP Only
Eagle Shadow Mountain Solar Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar In Progress MIP Only
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
I-495/I-270 Managed Lanes Study Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress FAST-41 Covered Projects
LaGuardia Airport Access Improvement Project, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress DOT Projects
Lake Pontchartrain and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Leavitt Reservoir Expansion Department of the Interior Bureau of Land Management Water Resources Irrigation and related water supply projects In Progress MIP Only
Mineville Energy Storage Project Federal Energy Regulatory Commission Office of Energy Projects Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) In Progress MIP Only
MVP Southgate CP19-14 Federal Energy Regulatory Commission Office of Energy Projects Pipelines Interstate Natural Gas Pipelines In Progress MIP Only
New Mexico Unit Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
Pier B On-Dock Rail Support Facility Department of Transportation Maritime Administration Ports and Waterways Port expansion or improvement undertakings or projects In Progress DOT Projects
Plains Pipeline, L.P. Lines 901 and 903 Replacement Project Department of the Interior Bureau of Land Management Conventional Energy Production Land-based Oil & Gas - Production/Extraction In Progress FAST-41 Covered Projects
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress FAST-41 Covered Projects

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Titlesort descending Agency/Department Sector Project Status Estimated Completion
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
ADS-B In Trail Procedures DOT Aviation Complete 9/29/2015
Arroyo Sequit Creek Steelhead Restoration Project DOC Green Infrastructure Complete 1/06/2016
BakkenLink Crude Oil Pipeline DOI Pipelines Complete 9/27/2012
Baltimore Red Line DOT Surface Transportation Cancelled 2/27/2013
Bayonne Bridge Raising DHS Ports and Waterways Complete 11/01/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015
Charleston Harbor Post-45 Study USACE Ports and Waterways In Progress 8/31/2015
Crenshaw/LAX DOT Surface Transportation Complete 9/27/2012
DC-Maryland Regional Trail Network DOT Surface Transportation Complete 9/29/2012

Pages