(TX) East West Connector (Rental Car Drive)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
09/02/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The proposed project would be a new location paved roadway facility From SH 360 to Rental Car Drive, the new location roadway would be approximately 156-395 feet in width and would comprise a total of approximately 42.8 acres of proposed ROW on land owned by DFW Airport. A portion of the project would occupy approximately 4.5 acres of existing TxDOT right-of-way (ROW) at the western terminus at SH 360 to tie into the SH 360 frontage road at the existing intersection of SH 360 and East Harwood Road. The proposed project would also tie into the existing service roads of International Parkway at the existing intersection with Rental Car Drive at the eastern terminus.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|