DOT Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director encourages you to engage with their office in pre-application consultations. Email FAST-41@permitting.gov for more information. To learn more about Fast-41 covered projects, please visit the Permitting Council’s new website at permitting.gov.
Classifications of projects that are contained within the Federal Infrastructure Permitting Dashboard:
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- FAST-41 Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information.
The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
| Title | Agency | Sector | Status |
|---|---|---|---|
| IMPROVEMENTS TO STATE ROUTE 37 | California, CalTrans | Surface Transportation, Highways | Cancelled |
| (TX) Austin Avenue Bridges (Morrow Street to Third Street) | Texas | Surface Transportation, Highways | Class of Action Changed |
| (TX) Borderland Expressway | Texas | Surface Transportation, Highways | Complete |
| (TX) Denton County Outer Loop | Texas | Surface Transportation, Highways | In Progress |
| (TX) Downtown 10 (El Paso Executive Center Blvd to SL 478) | Texas | Surface Transportation, Highways | In Progress |
| (TX) East Loop (Old SH 32) | Texas | Surface Transportation, Highways | In Progress |
| (TX) East West Connector (Rental Car Drive) | Texas | Surface Transportation, Highways | Complete |
| (TX) Extend FM 1301 on New Location (from SH 60 to US 59) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 2001 (from IH 35 to SH 21) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 2220 Ware Road Widening SH 107 to Mile 5 | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 3349 at US 79 (FM 3349 & CR 110) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 518 (from FM 865 to SH 35) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 518 (from SH 288 to FM 865) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 664 (US 287 to FM 1387) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 676 and Mile 5 (From SH 107 to Taylor Road) | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 70/SH 286 Passing Lanes | Texas | Surface Transportation, Highways | Complete |
| (TX) FM 756 Paluxy Dr | Texas | Surface Transportation, Highways | Complete |
| (TX) Hachar-Reuthinger Rd | Texas | Surface Transportation, Highways | Complete |
| (TX) IH 10 (from FM 2434 to US 90) | Texas | Surface Transportation, Highways | Complete |
| (TX) IH 10/69 Interchanges (Hollywood Overpass to 7th Street) | Texas | Surface Transportation, Highways | Complete |