Milestone Extension: Use Authorization (DOI-BOR)
A confluence of interconnected issues has contributed to the need to revise the overall permitting timetable for this project. The dates are shifting mainly because additional ESA species surveys have been added to the biological work plan in consultation with USFWS and the cultural resource surveys need to be re-performed.