USA logoAn Official Website of the United States Government

You are here

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Statussort descending Major Infrastructure Project
R.C. Byrd Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Cancelled No
Tennessee Gas Abandonment and Capacity Restoration Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Cancelled No
Fort Mojave Solar Project (Fort Mojave Tribe) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Cancelled No
North-South Project Department of Agriculture US Forest Service Pipelines Land-based Oil & Gas - Production/Extraction Cancelled No
Plains and Eastern Clean Line Department of Energy Office of Electricity Delivery and Energy Reliability Electricity Transmission Electricity Transmission (all) Complete No
Hudson River Rebuild by Design Project : Resist, Delay, Store, Discharge Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Complete No
Denbury Riley Ridge to Natrona Project CO2 Department of the Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction Complete No
Palen Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar Complete No
William States Lee III Nuclear Station, Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Kake to Petersburg Transmission Project Department of Agriculture US Forest Service Electricity Transmission Electricity Transmission (all) Complete No
Levy Nuclear Plant Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Red River L&D No. 4 Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Mountain Valley and Equitrans Expansion Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
Swan Lake North Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Nexus Gas Transmission, TEAL, DTE Lease, and Vector Lease Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
Energy Gateway South Transmission Project Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Chokecherry-Sierra Madre Wind Energy (Phase 1) Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore Complete No
North Anna Power Station, Unit 3 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Turkey Point, Units 6 and 7 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Gateway West Segments 8 & 9 Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Statussort descending Major Infrastructure Project
Cedar Rapids Logistics Park in Iowa Project Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
Chino Airport Non-Aeronautical Land Use Lease, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
South Padre Island 2nd Access States Texas Surface Transportation Highways Cancelled No
Tier 1 EIS I-90-94 Study Portage to Wisconsin Dells (Juneau- Sauk- and Columbia Counties) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Little Cottonwood Canyon States Utah Surface Transportation Roads Cancelled No
US 51 I-39/90 - US 12/18 (Beltline); Stoughton - McFarland Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Capitol Expressway Corridor Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Cancelled No
Lone Star Regional Rail Project - from San Antonio to Georgetown- TX Department of Transportation Federal Highway Administration Surface Transportation Railroads Cancelled No
Bloomfield Municipal Airport Land Acquisition, Pond Removal, and Construction of a Parallel Taxiway, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Charlotte International Airport Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
SR 187 (US 331) from SR10 (US90) to Alabama State Line States Florida Surface Transportation Highways Cancelled No
Proposed Hotel Development at LaGuardia Airport, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Rio Vista Bridge Operation Overhaul States California Surface Transportation Bridges Cancelled No
MARTA Georgia 400 Transit Initiative Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Cancelled No
Kake Access - (1306-EIS) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Atlantic City International Airport Obstruction Removal for Runways 13-31 and 4-22, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Shiloh Launch Complex Proposed Launch Site, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Commercial Space Launch Site Operator License Cancelled No
SR 20 IMPROVEMENTS (1306-EIS) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Norfolk International Airport New Parallel Runway Development, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Chicago-to-Detroit/Pontiac Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agency Bureau/Mode Sector Project Type Statussort descending Project Category
Tri-County Access Project Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled DOT Projects
Leavitt Reservoir Expansion Department of the Interior Bureau of Land Management Water Resources Irrigation and related water supply projects Complete MIP Only
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress FAST-41 Covered Projects
Coos Bay, Oregon Section 408/204(f) Channel Modification Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
Lake Powell Pipeline Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
Upper Barataria Basin Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Crimson Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress MIP Only
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress FAST-41 Covered Projects
MVP Southgate CP19-14 Federal Energy Regulatory Commission Office of Energy Projects Pipelines Interstate Natural Gas Pipelines In Progress MIP Only
Wilmington Harbor Navigation Improvement Project (WHNIP) 203 Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
I-526 Lowcountry Corridor West Improvements Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
I-285 Top End Express Lanes Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Eagle Shadow Mountain Solar Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar In Progress MIP Only
Lake Pontchartrain and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Alkali Creek Reservoir Project Department of the Interior Bureau of Land Management Water Resources Irrigation and related water supply projects In Progress MIP Only
New Jersey Back Bays Coastal Storm Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Collier County Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Yellow Pine Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
South Central Coast Louisiana Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Coordinating Agency Sector Project Status Target Completion Date
Red Rock Hydroelectric Project USACE Water Resource Complete 3/30/2014
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
ADS-B In Trail Procedures DOT Aviation Complete 9/29/2015
BakkenLink Crude Oil Pipeline DOI Pipelines Complete 9/27/2012
Bayonne Bridge Raising DHS Ports and Waterways Complete 11/01/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015
Charleston Harbor Post-45 Study USACE Ports and Waterways In Progress 8/31/2015
Desert Harvest Solar Energy DOI Renewable Energy Complete 2/21/2013
Devil's Lake Rail Improvements DOT Surface Transportation Complete 12/30/2012
Enterprise Mid-American Pipeline (Western Expansion Project II) DOI Pipelines Complete 8/30/2012

Pages