USA logoAn Official Website of the United States Government

You are here

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agencysort descending Bureau/Mode Sector Project Type Status Major Infrastructure Project
North-South Project Department of Agriculture US Forest Service Pipelines Land-based Oil & Gas - Production/Extraction Cancelled No
Cardinal-Hickory Creek 345 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress No
Kake to Petersburg Transmission Project Department of Agriculture US Forest Service Electricity Transmission Electricity Transmission (all) Complete No
Plains and Eastern Clean Line Department of Energy Office of Electricity Delivery and Energy Reliability Electricity Transmission Electricity Transmission (all) Complete No
Mid-Breton Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Planned No
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress Yes
Mid-Barataria Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Gateway West Segments 8 & 9 Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Aiya Solar Project (Moapa) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Paused No
Plains Pipeline, L.P. Lines 901 and 903 Replacement Project Department of the Interior Bureau of Land Management Conventional Energy Production Land-based Oil & Gas - Production/Extraction Paused Yes
Boardman to Hemingway Transmission Line Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) In Progress No
Liberty Development and Production Plan Department of the Interior Bureau of Ocean Energy Management Conventional Energy Production Offshore Oil & Gas In Progress No
South Fork Wind Farm and South Fork Export Cable Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Paused Yes
Transwest Express Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Denbury Riley Ridge to Natrona Project CO2 Department of the Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction Complete No
Palen Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar Complete No
Ten West Link Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) In Progress No
Desert Quartzite Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress No
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress Yes
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned Yes

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Shiloh Launch Complex Proposed Launch Site, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Commercial Space Launch Site Operator License Cancelled No
Norfolk International Airport New Parallel Runway Development, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
SEIS - Gravina Access Project Department of Transportation Federal Highway Administration Surface Transportation Bridges Complete No
SEIS - Juneau Access Improvements Project Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
SEIS - Sterling Highway MP 45-60 Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
I-10 Mobile River Bridge & Bayway Widening Department of Transportation Federal Highway Administration Surface Transportation Bridges Complete No
I-70 East Corridor EIS Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
US 50 Corridor East Tier 1 EIS Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 113 North/South Study - Millsboro South Area Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
CR388 Segment 1 (Westbay Parkway) from SR 30 (US 98) to SR 79 States Florida Surface Transportation Highways In Progress No
Gulf Coast Parkway (from CR386/US98 to US231) States Florida Surface Transportation Highways In Progress No
SR 87 Connector (from SR 87 S Intersecting with SR 87 N near Southridge Rd) Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
Cattle Point Road Department of Transportation Federal Highway Administration Surface Transportation Roads Complete No
Peoria Eastern Bypass Department of Transportation Federal Highway Administration Surface Transportation Roads Paused No
SEIS - U.S. Rt. 34 Carman Rd. (E. of Gulfport) to Monmouth- IL- Henderson and Warren Cos Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
US 30- IL136 near Fulton to IL 40 in Rock Falls- Whiteside County Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
US 51- S. of Pana to E. of Irvington- 70 miles Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
I-69 Tier 2 Section 6 SR 39 to I-465 Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
I-49 Inner City Connector Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
Calcasieu River Bridge I-10 (PPG Drive - US 90E) Department of Transportation Federal Highway Administration Surface Transportation Bridges In Progress No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agencysort descending Bureau/Mode Sector Project Type Status Project Category
McClellanville 115 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress MIP Only
Crow Creek Pipeline Project Department of Agriculture US Forest Service Pipelines Interstate Natural Gas Pipelines In Progress MIP Only
Florida Keys Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Surry-Skiffes Creek-Whealton Aerial Transmission Line Department of the Army US Army Corps of Engineers - Regulatory Electricity Transmission Electricity Transmission (all) In Progress MIP Only
Memphis Metropolitan Stormwater Management Project: North DeSoto County, Mississippi Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
US 275 West Point to Scribner Department of the Army US Army Corps of Engineers - Regulatory Surface Transportation Highways In Progress MIP Only
Upper Barataria Basin Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress FAST-41 Covered Projects
Coos Bay, Oregon Section 408/204(f) Channel Modification Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
Wilmington Harbor Navigation Improvement Project (WHNIP) 203 Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
New Jersey Back Bays Coastal Storm Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Lake Pontchartrain and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Collier County Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
South Central Coast Louisiana Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Buffalo Bayou and Tributaries, Texas Resiliency Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Miami-Dade County Back-Bay Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
West Bank and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Campo Wind Project with Boulder Brush Facilities Department of the Interior Bureau of Indian Affairs Renewable Energy Production Wind: Other than Federal Offshore In Progress MIP Only
Vineyard Wind Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress MIP Only

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Coordinating Agency Sector Project Status Target Completion Date
Red Rock Hydroelectric Project USACE Water Resource Complete 3/30/2014
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
ADS-B In Trail Procedures DOT Aviation Complete 9/29/2015
BakkenLink Crude Oil Pipeline DOI Pipelines Complete 9/27/2012
Bayonne Bridge Raising DHS Ports and Waterways Complete 11/01/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015
Charleston Harbor Post-45 Study USACE Ports and Waterways In Progress 8/31/2015
Desert Harvest Solar Energy DOI Renewable Energy Complete 2/21/2013
Devil's Lake Rail Improvements DOT Surface Transportation Complete 12/30/2012
Enterprise Mid-American Pipeline (Western Expansion Project II) DOI Pipelines Complete 8/30/2012

Pages