FAST-41 Missed Date:Section 10 Rivers and Harbors Act of 1899 and Section 404 Clean Water Act: Final Verification/Permit Decision Rendered (Agency Action)

Submitted by Anonymous on

Agency Milestone Date of 01/25/2024 for Final Verification/Permit Decision Rendered (Agency Action) has passed by 1 business days

Action
Project Name: Responsible Agency:
US Army Corps of Engineers - Regulatory
Agency Status: Cooperating under FAST-41
Cooperating under NEPA
Status:
In Progress
POC Name:
Christine Jacek
POC Title:
Regulatory Project Manager

Description:

Department of Army authorization from the US Army Corps of Engineers New England District is required pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act.  Activities that require authorization include: Installation of turbine structures on monopile foundations embedded in the ocean floor. Installation of export cable(s) and associated cable protection. Installation of inter-array cables between turbine structures and offshore substations. Monopile or jacket pile supported offshore substation(s). Horizontal directional drilling will be utilized along the shoreline for the export cable to begin its path to a substation/grid connection. 

Milestones:

Pre-construction Notification (PCN)/Form ENG 4345/Joint Application Form Received (Applicant Action)
Completed Date:
Complete Pre-Construction Notification (PCN)/Application Received (Applicant Action)
Completed Date:
Publication of Public Notice (Agency Action)
Completed Date:
Final Verification/Permit Decision Rendered (Agency Action)
  • Monthly Status Report for November 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone to April 9, 2027.
  • Monthly Status Report for October 2026:
    Given that USACE had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM/MMS’s review of the EIS, USACE cannot finalize a decision until BOEM/MMS’s reconsideration of the EIS is complete.  As such, USACE is moving the current FAST-41 milestone from October 9, 2026, to April 9, 2027. 
  • Monthly Status Report for September 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for August 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for July 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for June 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for May 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for April 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps is moving the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for March 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for February 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for January 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for December 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for November 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for October 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed, as needed, in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for September 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for August 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for July 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for June 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for May 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for June 26, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for April 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for June 26, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for March 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed.
  • Monthly Status Report for February 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed.
  • Monthly Status Report for January 2025:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule.
  • Monthly Status Report for December 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025.  
  • Monthly Status Report for November 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for October 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for September 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for August 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for July 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for June 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025.  
  • Monthly Status Report for May 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025
  • Monthly Status Report for April 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025
  • Monthly Status Report for March 2024:
    USACE is a cooperating agency for this project. BOEM is the lead agency. USACE milestones rely on the schedule set by the lead agency. BOEM, as lead agency, is undertaking a review of the permitting timetable for this project with the cooperating agencies and in consultation with the project sponsor. The review encompasses all remaining agency actions and milestone dates for the project, including this action. The review will result in an updated permitting timetable for all remaining actions, including this milestone. BOEM submitted a revised timetable on February 16, 2024. 
  • Non-conformance Explanation:
    USACE is a cooperating agency for this project. BOEM is the lead agency. USACE milestones rely on the schedule set by the lead agency. BOEM, as lead agency, is undertaking a review of the permitting timetable for this project with the cooperating agencies and in consultation with the project sponsor. The review encompasses all remaining agency actions and milestone dates for the project, including this action. The review will result in an updated permitting timetable for all remaining actions, including this milestone. BOEM intends to submit a revised timetable after February 16, 2024. 
Alternative Completion Date:
Milestone
Final Verification/Permit Decision Rendered (Agency Action)
  • Monthly Status Report for November 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone to April 9, 2027.
  • Monthly Status Report for October 2026:
    Given that USACE had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM/MMS’s review of the EIS, USACE cannot finalize a decision until BOEM/MMS’s reconsideration of the EIS is complete.  As such, USACE is moving the current FAST-41 milestone from October 9, 2026, to April 9, 2027. 
  • Monthly Status Report for September 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for August 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for July 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for June 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for May 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for April 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps is moving the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for March 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for February 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for January 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for December 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for November 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for October 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed, as needed, in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for September 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for August 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for July 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for June 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for May 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for June 26, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for April 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for June 26, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for March 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed.
  • Monthly Status Report for February 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed.
  • Monthly Status Report for January 2025:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule.
  • Monthly Status Report for December 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025.  
  • Monthly Status Report for November 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for October 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for September 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for August 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for July 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for June 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025.  
  • Monthly Status Report for May 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025
  • Monthly Status Report for April 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025
  • Monthly Status Report for March 2024:
    USACE is a cooperating agency for this project. BOEM is the lead agency. USACE milestones rely on the schedule set by the lead agency. BOEM, as lead agency, is undertaking a review of the permitting timetable for this project with the cooperating agencies and in consultation with the project sponsor. The review encompasses all remaining agency actions and milestone dates for the project, including this action. The review will result in an updated permitting timetable for all remaining actions, including this milestone. BOEM submitted a revised timetable on February 16, 2024. 
  • Non-conformance Explanation:
    USACE is a cooperating agency for this project. BOEM is the lead agency. USACE milestones rely on the schedule set by the lead agency. BOEM, as lead agency, is undertaking a review of the permitting timetable for this project with the cooperating agencies and in consultation with the project sponsor. The review encompasses all remaining agency actions and milestone dates for the project, including this action. The review will result in an updated permitting timetable for all remaining actions, including this milestone. BOEM intends to submit a revised timetable after February 16, 2024. 
Current Target Date:
Project

PROJECT WEBSITE: https://southcoastwind.com/

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/29/2027

7 out of 10

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Renewable Energy Production

SECTOR
Renewable Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Bureau of Ocean Energy Management

View FAST-41 Postings by Agencies

Other Agencies with Actions or Authorizations:

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Environmental Protection Agency

Environmental Protection Agency

Description:

Updated February 2023:  Mayflower Wind Project name changed to SouthCoast Wind Project.

The purpose of the SouthCoast Wind Project is to provide clean, renewable wind energy to the Northeast United States, including to Massachusetts. SouthCoast Wind will support reliability in Massachusetts and in the New England region, while meeting the Commonwealth’s statutory need for renewable/clean energy. The SouthCoast Wind Project also supports the federal need of grid reliability, as set forth the Federal Power Act in Section 215. Out of the 6.7 million people living in Massachusetts, nearly 5.1 million people live along coastal areas of the state. Offshore wind projects like SouthCoast Wind can provide a localized energy source to coastal populations.

The Executive Director granted a Bureau of Ocean Energy Management request to extend the OCS Air Permit completion date on November 30, 2023. The Executive Director determination is posted here.

The Executive Director granted a Bureau of Ocean Energy Management request to extend the Clean Water Act Section 402 Permit, National Pollutant Discharge Elimination System's completion date on April 23, 2024. The Executive Director determination is posted here.

The Executive Director granted a Bureau of Ocean Energy Management request to extend the Clean Water Act Section 402 Permit, National Pollutant Discharge Elimination System's completion date on February 26, 2025. The Executive Director determination is posted here.

 

field_status
System Comments
Agency Milestone Date of 01/25/2024 for Final Verification/Permit Decision Rendered (Agency Action) has passed by 1 business days
Approver Comments
<p>Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone to April 9, 2027.</p>
Previous Action Status
New Action Status
Missed Date Process
Yes
Missed Date Triggered by Extension
No
Agency Notified Date
New Milestone
Final Verification/Permit Decision Rendered (Agency Action)
  • Monthly Status Report for November 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone to April 9, 2027.
  • Monthly Status Report for October 2026:
    Given that USACE had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM/MMS’s review of the EIS, USACE cannot finalize a decision until BOEM/MMS’s reconsideration of the EIS is complete.  As such, USACE is moving the current FAST-41 milestone from October 9, 2026, to April 9, 2027. 
  • Monthly Status Report for September 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for August 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for July 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for June 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for May 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps moved the FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for April 2026:
    Given that the Corps had adopted the BOEM EIS to inform our decision-making process and because the evaluation of environmental considerations may change as a result of BOEM’s review of the EIS, the Corps cannot finalize a decision until BOEM’s reconsideration of the EIS is complete. To accommodate BOEM’s review of the EIS, the Corps is moving the current FAST-41 milestone from April 9, 2026, to October 9, 2026.
  • Monthly Status Report for March 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for February 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for January 2026:
    The final milestone has been rescheduled to April 9, 2026 and will be reassessed as needed in accordance with the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.
  • Monthly Status Report for December 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for November 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for October 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for January 9, 2026 and will be reassessed, as needed, in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for September 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for August 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for July 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for June 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for September 24, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for May 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for June 26, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for April 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed. The final milestone has been rescheduled for June 26, 2025 and will be reassessed as needed in accordance with the above referenced Presidential Memorandum.
  • Monthly Status Report for March 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed.
  • Monthly Status Report for February 2025:
    As per the January 20, 2025 Presidential Memorandum, Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects, USACE has paused the decision making for SouthCoast Wind until a comprehensive assessment by the Department of the Interior for wind energy leasing and permitting practices is completed.
  • Monthly Status Report for January 2025:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule.
  • Monthly Status Report for December 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025.  
  • Monthly Status Report for November 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for October 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for September 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for August 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for July 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of Mar 27, 2025. 
  • Monthly Status Report for June 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025.  
  • Monthly Status Report for May 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025
  • Monthly Status Report for April 2024:
    All schedule changes were made in response to the lead agency’s (BOEM) revised schedule. USACE is on track to meet the final permitting milestone of 3/27/2025
  • Monthly Status Report for March 2024:
    USACE is a cooperating agency for this project. BOEM is the lead agency. USACE milestones rely on the schedule set by the lead agency. BOEM, as lead agency, is undertaking a review of the permitting timetable for this project with the cooperating agencies and in consultation with the project sponsor. The review encompasses all remaining agency actions and milestone dates for the project, including this action. The review will result in an updated permitting timetable for all remaining actions, including this milestone. BOEM submitted a revised timetable on February 16, 2024. 
  • Non-conformance Explanation:
    USACE is a cooperating agency for this project. BOEM is the lead agency. USACE milestones rely on the schedule set by the lead agency. BOEM, as lead agency, is undertaking a review of the permitting timetable for this project with the cooperating agencies and in consultation with the project sponsor. The review encompasses all remaining agency actions and milestone dates for the project, including this action. The review will result in an updated permitting timetable for all remaining actions, including this milestone. BOEM intends to submit a revised timetable after February 16, 2024. 
Current Target Date:
Response Date