USA logoAn Official Website of the United States Government

You are here

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
R.C. Byrd Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Cancelled No
Red River L&D No. 4 Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Swan Lake North Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Tennessee Gas Abandonment and Capacity Restoration Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Cancelled No
Turkey Point, Units 6 and 7 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines Complete No
WB Xpress Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
William States Lee III Nuclear Station, Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Ten West Link Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) In Progress No
Levy Nuclear Plant Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Mid-Barataria Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Chokecherry-Sierra Madre Wind Energy (Phase 1) Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore Complete No
Boardman to Hemingway Transmission Line Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) In Progress No
Transwest Express Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Alaska LNG Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress No
Cardinal-Hickory Creek 345 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress No
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress Yes
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned Yes
Chokecherry/Sierra Madre Wind, Phase II Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress No
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress Yes

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
I-10 to US 61 in St John the Baptist Parish Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
Tier One Baton Rouge Loop Toll Facility Department of Transportation Federal Highway Administration Surface Transportation Roads In Progress No
I-395/Route 9 Transportation Study Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
Mid-Currituck Department of Transportation Federal Highway Administration Surface Transportation Bridges Complete No
Tucson-Phoenix Passenger Rail Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
ACEforward Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
LOSSAN North Rail Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
NEC Future Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Washington Union Station Expansion Project Department of Transportation Federal Railroad Administration Surface Transportation Railroads In Progress No
All Aboard Florida: Miami - Orlando Passenger Rail Service Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Atlanta - Charlotte Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads In Progress No
Atlanta - Chattanooga High Speed Ground Transportation Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Amtrak Baltimore and Potomac Tunnel Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Chicago-to-Detroit/Pontiac Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
Minneapolis-St. Paul to Milwaukee High-Speed Rail Corridor Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
Port Bienville Railroad Feasibility Study and Environmental Documentation Department of Transportation Federal Railroad Administration Surface Transportation Railroads In Progress No
Southeast High Speed Rail Corridor Richmond VA to Raleigh NC Service Development Program Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Empire Corridor Improvements - Service Development Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads In Progress No
Pacific Northwest Rail Corridor Program: Oregon Segment Department of Transportation Federal Railroad Administration Surface Transportation Railroads In Progress No
Southern and Eastern Wake Expressway, "Complete 540" Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agency Bureau/Mode Sector Project Type Status Project Category
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress FAST-41 Covered Projects
Lake Pontchartrain and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
South Central Coast Louisiana Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
West Bank and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Surry-Skiffes Creek-Whealton Aerial Transmission Line Department of the Army US Army Corps of Engineers - Regulatory Electricity Transmission Electricity Transmission (all) In Progress MIP Only
Pier B On-Dock Rail Support Facility Department of Transportation Maritime Administration Ports and Waterways Port expansion or improvement undertakings or projects In Progress DOT Projects
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Upper Barataria Basin Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Crimson Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress MIP Only
Eagle Shadow Mountain Solar Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar In Progress MIP Only
Yellow Pine Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
Boise River Basin Feasibility Study Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
McClellanville 115 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress MIP Only
Commonwealth LNG Project Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress MIP Only
Allston I-90 Multimodal Project Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Ocean Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned FAST-41 Covered Projects
I-526 Lowcountry Corridor West Improvements Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
I-285 Top End Express Lanes Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Collier County Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Miami-Dade County Back-Bay Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Coordinating Agency Sector Project Status Target Completion Datesort descending
Desert Harvest Solar Energy DOI Renewable Energy Complete 2/21/2013
Baltimore Red Line DOT Surface Transportation Cancelled 2/27/2013
Tappan Zee Bridge Replacement DOT Surface Transportation Complete 2/27/2013
Point Defiance Bypass DOT Surface Transportation Complete 2/27/2013
McCoy Solar Energy (NextEra) DOI Renewable Energy Complete 3/12/2013
Silver State Solar South Project (First Solar) DOI Renewable Energy Complete 3/20/2013
NiSource - Columbia Gas Transmission, LLC Modernization Project DOT Pipelines Complete 3/28/2013
University Circle - Little Italy Rapid Station DOT Surface Transportation Complete 4/29/2013
Quartzsite Solar Energy Project DOI Renewable Energy Complete 6/02/2013
Mohave Wind Energy (BP Wind) DOI Renewable Energy Complete 6/17/2013

Pages