Because the Commission’s milestone target dates, including those for issuance of the draft and final NEPA documents, were modified to account for the additional time needed for the project sponsor to complete required studies, dependent milestone target dates are being modified accordingly.
Cooperating under NEPA
Description:
The Bureau of Land Management's (BLM) role is to consider authorizing the project through issuance of a right-of-way grant. As a cooperating agency, the BLM will review the EIS to ensure the analysis is in conformance with the Federal Land Management Policy Act, Ely Resource management Plan, and the 2015 Nevada/Northeastern California Greater Sage grouse land use plan amendment. Accordingly, a land use plan amendment notification may be required as well as an additional 30 days for Nevada Governor’s office consistency review.
Milestones:
-
Environmental Impact Statement (EIS)
:
Official Notice of Availability of a Final EIS published in the FR beginning both the public review period and concurrent CAA Section 309 Review (Agency Action)
- Current Target Date: 07/21/2028
-
Environmental Impact Statement (EIS)
:
Official Notice of Availability of a Final EIS published in the FR beginning both the public review period and concurrent CAA Section 309 Review (Agency Action)
- Current Target Date: 07/21/2028
PROJECT WEBSITE: https://www.whitepinepumpedstorage.com/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/19/2028
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Renewable Energy Production
CATEGORY
Project Category
FAST-41 Covered Projects
LEAD AGENCY
Federal Energy Regulatory Commission
View FAST-41 Postings by Agencies
Description:
The proposed 1,000-megawatt closed-loop project would be located in White Pine County, Nevada, and include the construction of two reservoirs, an underground water conveyance system and powerhouse, a 345-kilovolt transmission line, and other project facilities. The proposed project would be located on federal lands managed by the Bureau of Land Management.
-
Environmental Impact Statement (EIS)
:
Official Notice of Availability of a Final EIS published in the FR beginning both the public review period and concurrent CAA Section 309 Review (Agency Action)
- Current Target Date: 07/21/2028
-
Environmental Impact Statement (EIS)
:
Official Notice of Availability of a Final EIS published in the FR beginning both the public review period and concurrent CAA Section 309 Review (Agency Action)
- Current Target Date: 07/21/2028
Original Target Date: 07/30/2025
Milestone: Final decision/agency action (Agency Action)
Requested extensions greater than 30 days for this Action are shown below:
Final decision/agency action (Agency Action) extended by 527
From: 07/30/2025
To: 01/08/2027