Milestone Extension: Environmental Assessment (EA)

Submitted by craig.litteken… on

BLM, as part of its standard process for solar projects, requires several baseline studies before beginning NEPA. The Project Sponsor and BLM have worked together to ensure completeness of the required studies and coordinated to manage BLM review and Project Sponsor submittals to maintain progress. Through recent increased coordination, the agency and Project Sponsor agreed that additional time is needed to finalize and approve the required studies.

Action
Project Name: Responsible Agency:
Bureau of Land Management
Status:
Planned
POC Name:
Whitney Wirthlin
POC Title:
Assistant Field Manager, Pahrump Field Office
POC Email:

Milestones:

Determination to prepare an Environmental Assessment (EA) (Agency Action)
Current Target Date:
Issuance of a Draft EA / Release for Public Review (Agency Action)
Current Target Date:
Issuance of a Final EA (Agency Action)
Current Target Date:
EA Process Concluded (Agency Action)
Current Target Date:
Milestone
EA Process Concluded (Agency Action)
Current Target Date:
Project

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/06/2027

0 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Renewable Energy Production

SECTOR
Renewable Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Bureau of Land Management

View FAST-41 Postings by Agencies

Other Agencies with Actions or Authorizations:

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Description:

The Silver Star Solar 1 (project) would be entirely on land administered by the Bureau of Land Management (BLM), Southern Nevada District Office (SNDO) in the unincorporated Town of Amargosa Valley, Nye County, Nevada. The proposed project includes construction, operation, maintenance, and decommissioning of a 650 megawatt (MW) alternating current solar photovoltaic power generating facility with a 650 MW battery energy storage system on approximately 3,005 acres. The solar generation field would be located approximately five miles south of U.S. Highway 95 and six miles west of State Highway 373. Death Valley National Park is approximately four miles southwest of the Project. The proposed Project would be on Solar Variance lands as identified in the 2012 Final Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern States (Solar PEIS).

 

The Executive Director granted a Bureau of Land Management request to extend the Right-of-Way Authorization, NEPA, and ESA-FWS completion dates on December 20, 2024. The Executive Director determination is posted here.

field_status
System Comments
Furthest out
Original Target Date: 11/30/2025
Milestone: EA Process Concluded (Agency Action)

Requested extensions greater than 30 days for this Action are shown below:

EA Process Concluded (Agency Action) extended by 190
From: 11/30/2025
To: 06/08/2026
Approver Comments
Executive Director Determination signed on 12/20/24.
Missed Date Process
No
Missed Date Triggered by Extension
No
Original Milestone
EA Process Concluded (Agency Action)
Current Target Date:
Furthest Original Target Date Milestone
EA Process Concluded (Agency Action)
Current Target Date: