Milestone Extension: Construction and Operations Plan

Submitted by cori.carraway@… on

COP final decision/agency action milestone is dependent on the NEPA timeline and affected commensurately by delays.

Action
Project Name: Responsible Agency:
Bureau of Ocean Energy Management
Status:
In Progress
POC Name:
Meredith Lilley
POC Title:
Project Coordinator
Action Outcome:
Notice to proceed

Milestones:

Initial application submitted (Applicant Action)
Completed Date:
Milestone Details

Project Sponsor submits a Construction and Operations Plan (COP) in accordance with the regulations at 30 CFR 585.626 - 585.627.

Application deemed complete (Agency Action)
Completed Date:
Final decision/agency action (Agency Action)
Current Target Date:

Additional Milestones:

Additional Milestones
Agency Review of Initial Application - for Consistency with the NOI Checklist (Agency Action)
Completed Date:
Additional Milestone Details

The milestone documents completion of BOEM's review to determine whether the COP is sufficiently complete for the purposes of issuing an NOI in accordance with the NEPA regulations at 40 CFR 1501.9 and BOEM's regulations at 30 CFR part 585.  BOEM reviews the COP for consistency with published guidance titled BOEM Guidance on Information Needed for Issuance of a Notice of Intent (NOI) Under the National Environmental Policy Act (NEPA) for a Construction and Operations Plan ("NOI Checklist").  Upon completion of the review, BOEM marks this milestone complete and notifies the applicant if the COP lacks any of the required information.

Applicant Submits a Revised Application - for Compliance with the NOI Checklist (Applicant Action)
Completed Date:
Additional Milestone Details

Applicant submits a revised COP to comply with the NOI Checklist requirements. 

 

Agency Determines Application Is Consistent with the NOI Checklist (Agency Action) 
Completed Date:
Additional Milestone Details

BOEM conducts a review and evaluates whether the application is consistent with the NOI Checklist requirements.  If the review results in a finding of consistency, BOEM marks this milestone complete.  If supplemental filings have been agreed to between BOEM and the Applicant, BOEM will activate an additional milestone for COP Supplemental Filings.

Milestone
Final decision/agency action (Agency Action)
Current Target Date:
Project

PROJECT WEBSITE: Vineyard Offshore

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/09/2026

0 out of 10

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Renewable Energy Production

SECTOR
Renewable Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Bureau of Ocean Energy Management

View FAST-41 Postings by Agencies

Other Agencies with Actions or Authorizations:

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Environmental Protection Agency

Environmental Protection Agency

Description:

Vineyard Northeast proposes to construct and operate the Project located in Lease Area OCS-A 0522, which covers approximately 132,370 acres (ac) and is located approximately 31 miles from Nantucket, Massachusetts and 39 miles from Martha’s Vineyard, Massachusetts.

Offshore components of the Project will consist of up to 160 wind turbine generators (WTG) and electrical service platform (ESP) positions within the Lease Area with one nautical mile spacing between positions. The WTGs and ESPs will be supported by monopiles or piled jacket foundations.

Between the Lease Area and shore, the offshore export cables will be installed within two offshore export cable corridors (OECC), the Massachusetts OECC and the Connecticut OECC.

    • The Massachusetts OECC will travel from the northernmost tip of the Lease Area to the Horseneck Beach Landfall site in Westport, Massachusetts.
    • The Connecticut OECC will travel from the southernmost tip of the Lease Area to three potential landfall sites: Eastern Point Beach, Ocean Beach, and Niantic Beach; all near New London, Connecticut.

Onshore components of the Project will include export cable landfall areas, high-voltage direct current onshore cables, high-voltage alternating current interconnection cables, converter and booster stations, and onshore substation facilities in Massachusetts and Connecticut. 

field_status
System Comments
Furthest out
Original Target Date: 06/23/2026
Milestone: Final decision/agency action (Agency Action)

Requested extensions greater than 30 days for this Action are shown below:

Final decision/agency action (Agency Action) extended by 139
From: 06/23/2026
To: 11/09/2026
Approver Comments
EDD Signed 4/18/2025 granting movement
Missed Date Process
No
Missed Date Triggered by Extension
No
Original Milestone
Final decision/agency action (Agency Action)
Current Target Date:
Furthest Original Target Date Milestone
Final decision/agency action (Agency Action)
Current Target Date: