Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Plains Pipeline, L.P. Lines 901 and 903 Replacement Project Department of the Interior Bureau of Land Management Conventional Energy Production Land-based Oil & Gas - Production/Extraction Paused Yes
South Fork Wind Farm and South Fork Export Cable Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Paused Yes
Mid-Breton Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Planned No
Palen Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar Complete No
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress Yes
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress Yes
Yellow Pine Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress Yes
Ocean Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned Yes

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Dallas to Fort Worth Core Express Service Department of Transportation Federal Railroad Administration Surface Transportation Railroads Paused No
Oklahoma City-South Texas Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Southeast High Speed Rail Corridor Washington DC to Richmond VA Service Development Program Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Boston South Station Expansion Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
US 70 Havelock Bypass Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
Red Line Extension Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Paused No
Pyramid Way/US-395 Connector Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
Cross Harbor Freight Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
West Lake Corridor Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
MARTA Clifton Road Transit Initiative Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Paused No
I-81 Viaduct Department of Transportation Federal Highway Administration Surface Transportation Bridges In Progress No
Eastside Transit Corridor Phase II Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Paused No
East San Fernando Valley Transit Corridor Department of Transportation Federal Transit Administration Surface Transportation Public Transportation In Progress No
Northern Branch Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Paused No
Salem River Crossing Department of Transportation Federal Highway Administration Surface Transportation Bridges Paused No
MARTA Georgia 400 Transit Initiative Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Cancelled No
Northwest Corridor Project (PR-22) Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
MARTA I-20 East Transit Initiative Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Paused No
Carolina Crossroads Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
METRO Blue Line Extension (Bottineau Light Rail Transit) Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agency Bureau/Mode Sector Project Type Status Project Category
Florida Keys Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Memphis Metropolitan Stormwater Management Project: North DeSoto County, Mississippi Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
South County Traffic Relief Effort States California Surface Transportation Highways In Progress DOT Projects
Lake Powell Pipeline Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
Wilmington Harbor Navigation Improvement Project (WHNIP) 203 Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
New Jersey Back Bays Coastal Storm Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
NYS Route 5 (Buffalo Skyway) Project Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Buffalo Bayou and Tributaries, Texas Resiliency Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Coordinating Agency Sector Project Status Target Completion Datesort descending
Gulf Marine Highway Intermodal Project DOT Ports and Waterways Complete 6/29/2013
Port of Jacksonville DOT Ports and Waterways Complete 6/30/2013
Enterprise WEP III - Mid America Pipeline (MAPL) DOI Pipelines Complete 7/31/2013
East St. Louis Illinois, Metro East Levee USACE Ports and Waterways Complete 9/14/2013
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
Red Rock Hydroelectric Project USACE Water Resource Complete 3/30/2014
Jacksonville Harbor (Channel Deepening Study) USACE Ports and Waterways Complete 4/29/2014
Dredge Sailors Haven, Talisman-Barrett Beach and Watch Hill Channels and Marinas DOT Surface Transportation Complete 12/14/2014
NextGen Infrastructure Initiative - Houston Metroplex (OAPM) DOT Aviation Complete 1/29/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015