FAST-41 Missed Date: Right-of-Way Authorization (DOI-BIA)

Submitted by Anonymous on

Final Required Milestone Date of 12/31/2019 for Issuance of decision for permit/approval has passed by 5 business days

Action
Project Name: Responsible Agency:
Bureau of Indian Affairs
Status:
Paused
POC Name:
Charles Lewis
POC Title:
Environmental Protection Specialist

Milestones:

Initial application submitted (Applicant Action)
Completed Date:
Final decision/agency action (Agency Action)
Current Target Date:
Milestone
Final decision/agency action (Agency Action)
Current Target Date:
Project

PROJECT WEBSITE: www.aiyasolarprojecteis.com

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Renewable Energy Production

SECTOR
Renewable Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Bureau of Indian Affairs

Description:

The Aiya Solar Project proposes to construct a 100 megawatt solar generating facility on 900 acres of tribal lands on the Moapa River Indian Reservation (Reservation), in Clark County, Nevada. The solar generating facility is consists of photovoltaic (PV) solar panels on fixed-tilt or single-axis tracking systems, and associated equipment such as power inventers and transformers, collection systems, a substation, an operations and maintenance building with parking, meteorology towers and security fencing and lighting.

An approximately three-mile long, single overhead 230 kilovolt (kV) transmission line will connect the solar project to the existing NV Energy Reid-Gardner Substation located on lands administered by the Bureau of Land Management (BLM). A right-of-way across federal public lands managed by the BLM is necessary to link the facility and transmission lines on the Reservation with an existing substation and transmission line outside of the Reservation. The project is expects to take approximately 12 months to construct and have a project life of 25 years. The Moapa Band of Paiute Indians is supplying water for the project through a lease and will be delivering water via a new, two-mile long, above-ground pipeline on the Reservation.

The Bureau of Indian Affairs released the Final Environmental Impact Statement in March 2016 and the Record of Decision was signed on September 14, 2016.  The ROW grant will be issued once a power purchase agreement has been completed for this project.

field_status
System Comments
Final Required Milestone Date of 12/31/2019 for Issuance of decision for permit/approval has passed by 5 business days
Approver Comments
The missed milestone completion date or delay was attributable to reasons beyond the control of the agency
Previous Action Status
New Action Status
Missed Date Process
No
Missed Date Triggered by Extension
No
New Milestone
Final decision/agency action (Agency Action)
Current Target Date:
Response Date