FAST-41 Missed Date:Environmental Assessment (EA): Issuance of a Draft EA / Release for Public Review (Agency Action)

Submitted by Anonymous on

Agency Milestone Date of 08/25/2023 for Issuance of a Draft EA / Release for Public Review (Agency Action) has passed by 1 business days

Action
Project Name: Document URL: https://dot.ca.gov/-/media/dot-media/district-4/documents/d4-environmental-docs…
Responsible Agency:
CalTrans
Agency Status: Cooperating under NEPA
Status:
In Progress
POC Name:
Skylar Nguyen
POC Title:
Sr. Environmental Planner

Description:

Routine EA

Milestones:

Determination to prepare an Environmental Assessment (EA) (Agency Action)
Completed Date:
Issuance of a Draft EA / Release for Public Review (Agency Action)
Current Target Date:
Issuance of a Final EA (Agency Action)
Current Target Date:
EA Process Concluded (Agency Action)
Current Target Date:
Milestone
Issuance of a Draft EA / Release for Public Review (Agency Action)
Current Target Date:
Project

PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmenta…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/01/2026

1 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

State Route 37 Flood Reduction Project - The Project proposes a causeway that would be 35 feet in elevation and consist of four 12-foot-wide lanes, a 22-foot-wide median with a 2-foot-wide median barrier, two 10-foot-wide inside shoulders, two 12-foot-wide outside shoulders, two 2-foot-wide outside barriers, and a 14-foot-wide bicycle or pedestrian path with a 2-foot-wide barrier, for a total roadway width of 114 feet. There would be no change to the longterm vehicular capacity on SR 37. To maintain regional connectivity, the Project Summary State Route 37 Flood Reduction Project viii Environmental Impact Report/Environmental Assessment would be phased with the most flood-prone component, the Novato Creek Bridge and connecting structures, being built in Phase 1. Phase 2 would raise the rest of SR 37 within the Project area to reduce flooding and improve resiliency.

field_status
System Comments
Agency Milestone Date of 08/25/2023 for Issuance of a Draft EA / Release for Public Review (Agency Action) has passed by 1 business days
Approver Comments
System error - not FAST-41 covered project, reassigned to DOT. JM 10/18/23
Previous Action Status
New Action Status
Missed Date Process
No
Missed Date Triggered by Extension
No
New Milestone
Issuance of a Draft EA / Release for Public Review (Agency Action)
Current Target Date:
Response Date
Reporting Agency