USA logoAn Official Website of the United States Government

You are here

Error message

An illegal choice has been detected. Please contact the site administrator.

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
No projects to show
The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Typesort descending Status Major Infrastructure Project
SBD 40 COLORADO RIVER BR REHAB States California Surface Transportation Bridges Planned No
State Route 1: San Antonio Creek Bridge Scour States California Surface Transportation Bridges In Progress No
Carroll Creek Road Bridge Replacement States California Surface Transportation Bridges Class of Action Changed No
I-81 Viaduct Department of Transportation Federal Highway Administration Surface Transportation Bridges In Progress No
SR 101: San Jose Creek Bridge Replacement States California Surface Transportation Bridges In Progress No
San Joaquin Bridge Maintenance States California Surface Transportation Bridges Class of Action Changed No
Calcasieu River Bridge I-10 (PPG Drive - US 90E) Department of Transportation Federal Highway Administration Surface Transportation Bridges In Progress No
SR 140 BRIDGE RAIL UPGRADE States California Surface Transportation Bridges Planned No
SM 101 Cordilleras Creek Bridge Replacement States California Surface Transportation Bridges In Progress No
SEIS - Gravina Access Project Department of Transportation Federal Highway Administration Surface Transportation Bridges Complete No
Replace Belle Chase Bridge & Tunnel (1306-EA) Department of Transportation Federal Highway Administration Surface Transportation Bridges In Progress No
Shiloh Launch Complex Proposed Launch Site, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Commercial Space Launch Site Operator License Cancelled No
Spaceport Camden Proposed Launch Site, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Commercial Space Launch Site Operator License In Progress No
US 51 I-39/90 - US 12/18 (Beltline); Stoughton - McFarland Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
67th St Corridor Extension Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
I-5 Freight Corridor States California Surface Transportation Highways Complete No
Tulare Interchange Project States California Surface Transportation Highways Complete No
SR 187 (US 331) from SR10 (US90) to Alabama State Line States Florida Surface Transportation Highways Cancelled No
NORTH COUNTY CORRIDOR: CONSTRUCT EXPRESSWAY ON NEW ALIGNMENT States California Surface Transportation Highways In Progress No
I-215 SB; 4100 S to 4700 S States Utah Surface Transportation Highways In Progress No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
No projects to show

Pages

No matching projects were found.

Pages