USA logoAn Official Website of the United States Government

You are here

Error message

An illegal choice has been detected. Please contact the site administrator.

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
No projects to show
The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Statussort descending Major Infrastructure Project
Lone Star Regional Rail Project - from San Antonio to Georgetown- TX Department of Transportation Federal Highway Administration Surface Transportation Railroads Cancelled No
SR 187 (US 331) from SR10 (US90) to Alabama State Line States Florida Surface Transportation Highways Cancelled No
Rio Vista Bridge Operation Overhaul States California Surface Transportation Bridges Cancelled No
MARTA Georgia 400 Transit Initiative Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Cancelled No
Bloomfield Municipal Airport Land Acquisition, Pond Removal, and Construction of a Parallel Taxiway, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Atlantic City International Airport Obstruction Removal for Runways 13-31 and 4-22, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Little Cottonwood Canyon States Utah Surface Transportation Roads Cancelled No
Kake Access - (1306-EIS) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Shiloh Launch Complex Proposed Launch Site, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Commercial Space Launch Site Operator License Cancelled No
Chicago-to-Detroit/Pontiac Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
ACEforward Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
South Padre Island 2nd Access States Texas Surface Transportation Highways Cancelled No
Gateway Corridor Project EIS Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Cancelled No
Tier 1 EIS I-39-90-94 Study Madison to Portage (Dane and Columbia Counties) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Norfolk International Airport New Parallel Runway Development, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
LOSSAN North Rail Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Cancelled No
SR 20 IMPROVEMENTS (1306-EIS) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Tier 1 EIS I-90-94 Study Portage to Wisconsin Dells (Juneau- Sauk- and Columbia Counties) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Roseau Municipal Airport Development Project, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Huntington 5th Street and 8th Street Bridges Department of Transportation Federal Highway Administration Surface Transportation Bridges Cancelled No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agency Bureau/Mode Sector Project Type Statussort descending Project Category
Campo Wind Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Wind: Other than Federal Offshore MIP Only
Tri-County Access Project Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled DOT Projects
South Central Coast Louisiana Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Alkali Creek Reservoir Project Department of the Interior Bureau of Land Management Water Resources Irrigation and related water supply projects In Progress MIP Only
West Bank and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Leavitt Reservoir Expansion Department of the Interior Bureau of Land Management Water Resources Irrigation and related water supply projects In Progress MIP Only
U.S. Route 58/220 Bypass to North Carolina State Line Limited-Access Study Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Surry-Skiffes Creek-Whealton Aerial Transmission Line Department of the Army US Army Corps of Engineers - Regulatory Electricity Transmission Electricity Transmission (all) In Progress MIP Only
Crow Creek Pipeline Project Department of Agriculture US Forest Service Pipelines Interstate Natural Gas Pipelines In Progress MIP Only
LaGuardia Airport Access Improvement Project, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress DOT Projects
Vineyard Wind Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress MIP Only
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress FAST-41 Covered Projects
Pier B On-Dock Rail Support Facility Department of Transportation Maritime Administration Ports and Waterways Port expansion or improvement undertakings or projects In Progress DOT Projects
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Mineville Energy Storage Project Federal Energy Regulatory Commission Office of Energy Projects Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) In Progress MIP Only
New Mexico Unit Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress FAST-41 Covered Projects
Upper Barataria Basin Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress FAST-41 Covered Projects
US 275 West Point to Scribner Department of the Army US Army Corps of Engineers - Regulatory Surface Transportation Highways In Progress MIP Only

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Agency/Department Sector Project Status Estimated Completion
Red Rock Hydroelectric Project USACE Water Resource Complete 3/30/2014
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
ADS-B In Trail Procedures DOT Aviation Complete 9/29/2015
BakkenLink Crude Oil Pipeline DOI Pipelines Complete 9/27/2012
Bayonne Bridge Raising DHS Ports and Waterways Complete 11/01/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015
Charleston Harbor Post-45 Study USACE Ports and Waterways In Progress 8/31/2015
Desert Harvest Solar Energy DOI Renewable Energy Complete 2/21/2013
Devil's Lake Rail Improvements DOT Surface Transportation Complete 12/30/2012
Enterprise Mid-American Pipeline (Western Expansion Project II) DOI Pipelines Complete 8/30/2012

Pages