USA logoAn Official Website of the United States Government

You are here

Error message

An illegal choice has been detected. Please contact the site administrator.

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
No projects to show
The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Statussort descending Major Infrastructure Project
US 51- US 12/18 (Beltline) Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
Route 460 Corridor Improvements Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
National Trails Highway: Bridge Replacements States California Surface Transportation Bridges Paused No
High Desert Corridor - New State Route 138 Project States California Surface Transportation Highways Paused No
Southbound Eureka Slough Bridge Seismic Retrofit States California Surface Transportation Highways Planned No
SR 140 BRIDGE RAIL UPGRADE States California Surface Transportation Bridges Planned No
SR 39 Reopening States California Surface Transportation Highways Planned No
LA-110 Dodger Stadium States California Surface Transportation Highways Planned No
Rte 74 San Juan Canyon Bridge Improvements States California Surface Transportation Bridges Planned No
SR 91 and SR 110 Seismic Retrofit States California Surface Transportation Highways Planned No
SR163 BRIDGE RAIL UPGRADE States California Surface Transportation Bridges Planned No
SBD 40 COLORADO RIVER BR REHAB States California Surface Transportation Bridges Planned No
MERCED 99 WIDENING States California Surface Transportation Highways Planned No
South Madera 6-Lane States California Surface Transportation Highways Planned No
I-5 Mossdale HOV Widening States California Surface Transportation Highways Planned No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
No projects to show

Pages

No matching projects were found.

Pages