USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Environmental Assessment (EA)

Project Name: Document URL: <front>
Responsible Agency:
Ohio
Agency Status: Cooperating under FAST-41
Status:
In Progress
POC Name:
Tim Hill
POC Title:
ODOT OES Administrtor
Public Participation Website:

Description:

The City of Hamilton, in cooperation with the Butler County Transportation Improvement District (BCTID) and the Ohio Department of Transportation (ODOT), developed the North Hamilton Crossing (NHX) project to address longstanding transportation challenges in the northern part of Hamilton, Ohio. These challenges include congestion from increasing traffic volumes, a higher-than average crash rate, delays at train crossings, and bridge congestion on existing Great Miami River crossings.

The proposed NHX project is a four-lane, boulevard-style roadway which extends between NW Washington Boulevard and North B Street on the west side of the Great Miami River, and SR 129 at Hampshire Drive on the east side, a distance of approximately 2.5 miles. NHX includes a new bridge over the Great Miami River, a grade-separated crossing of the CSX/Norfolk Southern rail line, sidewalks, a shared-use path, and landscaped medians.

Milestones:

Determination to prepare an Environmental Assessment (EA) (Agency Action)
Completed Date:
Issuance of a Draft EA / Release for Public Review (Agency Action)
Completed Date:
Issuance of a Final EA (Agency Action)
Current Target Date:
EA Process Concluded (Agency Action)
Current Target Date: