Operations Plan / Surface Use Plan

Sector/Project Type
Agency / Department
Responsible Agency
DOI
Sector
Renewable Energy
Activity/Trigger
Surface disturbance activities prior to obtaining exploration or drilling permit, or start of NEPA approval process
Description
The operator may submit the Operations Plan (a.k.a. surface use plan): (1) as part of the GDP application; or (2) by itself, prior to submitting a GDP application, by using a Sundry Notice (NEPA analysis and approval required before starting surface operations (see 43 CFR 3261 - Drilling Operations: Getting a Permit). This will allow the operator to begin the NEPA approval process earlier and begin surface preparations while the rest of the GDP application is prepared. Plan describes access to well location(s), size of drilling pad(s), environmental mitigation measures, etc.
Statute or Regulations
Geothermal Steam Act (30 USC 1001 et seq.); Federal Land Policy Management Act (43 USC 1701 et seq.); Energy Policy Act of 2005 (Pub. L. 109-58)
NEPA
0
Permit Inventory Agency
BLM
Editorial Category