FAST-41 Missed Date: Special Use Permit (FS)

Submitted by Anonymous on

Final Required Milestone Date of 06/15/2022 for Issuance of decision for permit/approval has passed by 5 business days

Action
Project Name: Responsible Agency:
US Forest Service
Agency Status: Cooperating under FAST-41
Cooperating under NEPA
Status:
Cancelled
POC Name:
Scott Tangenberg
POC Title:
Forest Supervisor

Milestones:

Initial application submitted (Applicant Action)
Completed Date:
Application deemed complete (Agency Action)
Current Target Date:
Milestone Details

Application will be considered complete upon submission of the outstanding studies developed, approved, and reviewed by the Forest Service to meet SUA screening criteria 36 CFR 251.54(e), as committed to by the Nevada Hydro Company's May 14, 2020 letter to FERC.

Final decision/agency action (Agency Action)
Current Target Date:

There are no milestones to display.

There are no milestones to display.

Milestone
Final decision/agency action (Agency Action)
Current Target Date:
Project

PROJECT WEBSITE: LEAPS Hydropower

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Renewable Energy Production

SECTOR
Renewable Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Federal Energy Regulatory Commission

LEAD AGENCY
Federal Energy Regulatory Commission

Description:

The Lake Elsinore Advanced Pumped Storage Project (Project No. 14227) is a proposal to construct an original pumped storage project in California.  The proposed project would consist of:  (1) a new upper reservoir (Decker Canyon) having a 200-foot-high main dam and a gross storage volume of 5,750 acre-feet, at a normal reservoir surface elevation of 2,792 feet above mean sea level; (2) a powerhouse with two reversible pump-turbine units with a total installed capacity of 500 megawatts; (3) the existing Lake Elsinore to be used as a lower reservoir; (4) about 32 miles of 500-kilovolt transmission line connecting the project to an existing transmission line owned by Southern California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company transmission line located to the south.

On December 9, 2021, Commission staff issued a letter dismissing, without prejudice, the license application for the project.  On January 7, 2022, the project sponsor filed a request for rehearing or, in the alternative, motion for temporary stay of dismissal of license application.  On March 24, 2022, the Commission issued an order sustaining the result of the December 9, 2021 order and denying the motion for temporary stay.  

FAST-41 Initiation Notice

Project Application and Supporting Documents

Federal Agency Actions

Status of Mitigation Measures

  • Not applicable.  On March 24, 2022, the Commission issued an order sustaining the result of the December 9, 2021 order dismissing the license application for the project.

FERC Litigation

  • None filed.

Public Meetings and Comment Periods

  • There are no planned public meetings or comment periods.  On March 24, 2022, the Commission issued an order sustaining the result of the December 9, 2021 order dismissing the license application for the project.

Last updated March 29, 2022

field_status
System Comments
Final Required Milestone Date of 06/15/2022 for Issuance of decision for permit/approval has passed by 5 business days
Approver Comments
Exempting from nonconformance process because this action/project has been canceled.
Previous Action Status
New Action Status
Missed Date Process
No
Missed Date Triggered by Extension
No
New Milestone
Final decision/agency action (Agency Action)
Current Target Date:
Response Date