Roseau Municipal Airport Development Project, Environmental Assessment

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.


PROJECT STATUS
CANCELLED
SECTOR
Aviation
CATEGORY
DOT Projects
LEAD AGENCY
Department of Transportation
Description: 

THIS PROJECT IS CATEGORICALLY EXCLUDED. AN ENVIRONMENTAL ASSESSMENT IS NO LONGER BEING PREPARED.

 

Seal Coat Runway 16-34, Taxiways, Access Road (approx. 61,000 square yards)

• Rehabilitate Connecting Taxiway A: Mill & Overlay (approx. 2,800 square yards)

• Crack Seal Runway 16-34, Taxiways, Taxilanes, Apron, Access Road (approx. 79,000 square yards)

Construct Aircraft Parking Apron (approx. 9,900 square yards)

• Construct Connecting Taxiways (approx. 3,500 square yards)

• Remove Aircraft Parking Apron (approx. 6,200 square yards)

• Remove or Relocate Two Aircraft Storage Hangars (approx. 9,000 square feet total)

Remove Natural Growth Airspace Obstructions (approx. 29 acres of trees)

• Remove and Relocate Man-Made Airspace Obstructions (i.e. poles, fencing)

• Install Medium Intensity Approach Lighting System with Sequenced Flashers (MALSF)

• Construct MALSF Access Road (approx. 1,900’ x 20’)

• Replace Runway 16-34 Airfield Lighting (Precision Approach Path Indicator Lights, Runway End

Identifier Lights, Medium Intensity Runway Edge Lights, Airfield Guidance Signs) and Electrical Building

Construct Arrival/Departure Terminal Building (approx. 1,300 square feet)

• Construct Site Utilities (electric, septic, water, natural gas)

• Construct Terminal Area Fencing (approx. 1,800 linear feet)

• Construct Access Road & Parking Lot (approx. 2,000 square yards

Remove Existing & Construct New Above-Ground Fuel Facility (16,000 gallons total)

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action
Responsible Agency
Status
Actual Completion Date