Dulles Air Cargo, Passenger and Metro Access Highway (1306-EA)

PROJECT WEBSITE: Improving Access Dulles

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Description:

VDOT, in cooperation with the Federal Highway Administration (FHWA), is proposing to construct a limited-access roadway to the west of the Washington Dulles International Airport in Loudoun County, Virginia. VDOT is conducting an environmental study to evaluate options for a proposed Dulles Air Cargo, Passenger, and Metro Access Highway (DACPMAH) that would extend from the interchange of the planned Northstar Boulevard/Bi-County Parkway (VA Route 411) and Lee-Jackson Memorial Highway (US Route 50) to a new entrance into the western portion of Dulles Airport. 

The purpose of this project is to enhance the movement of people, passenger services and air cargo traffic to Washington Dulles International Airport and the planned Phase 2 extension of the Metrorail​ Silver Line. The proposed project is intended to reduce congestion and improve capacity on the existing roadway network in the Dulles South area.