Sol 12 3R: Roadway Rehabilitation
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/25/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
California
Description:
The California Department of Transportation (Caltrans) proposes to rehabilitate SR 12 in three segments from PM 20.57/PM 22.70, PM 23.70/ PM 25.50, and PM 25.50/ PM 26.41. For Segment one, improvements will be made to improve highway safety and ride quality for users, ultimately extending the service life of the pavement for a minimum of 20 years. A safety edge with shoulder backing will be placed adjacent to the pavement edge along SR 12 in both directions to improve traffic safety. For Segment three, nonstandard guardrails, thrie-beam barriers, and ADA curb ramps will be brought up to the current standards. Existing degraded drainage systems, within the project footprint, will also be upgraded with new culverts, headwalls, inverts, and/or joints. New drainage systems may also be constructed as part of the Segment two and Segment one improvements on this Project. Finally Proposed Segment two improvements will include constructing new drainage systems, upgrading the existing roadway to standard 12-foot travel lanes, standard 8-foot shoulders, and repairing vertical curves.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|