Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

RIV 86 CONSTRUCT NEW IC AT AVE 50 & BRIDGE OVER COACHELLA CHANNEL

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete icon

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/07/2019

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation icon

SECTOR
Surface Transportation

CATEGORY
DOT Projects

California icon

LEAD AGENCY
California, CalTrans

California icon

COOPERATING AGENCY California

Description:

The City of Coachella, in cooperation with the California Department of Transportation (Caltrans) District 8 and the Coachella Valley Association of Governments (CVAG), proposes the construction of a new interchange at State Route 86 (SR-86) and Avenue 50, approximately 1.1 miles north of the existing Avenue 52 intersection and 1.95 miles south of the existing Dillon Road interchange. The proposed project would convert portion of SR-86 from existing expressway to freeway with a new overcrossing structure and access ramps, which would accommodate traffic for existing and planned development in the area. The project would also improve safety and traffic operations by enhancing level of service (LOS) on the adjacent SR-86/Dillon Road interchange and SR-86/Avenue 52 intersection.

 

The proposed improvements include realignment and widening of Avenue 50 from the existing two-lane roadway to a six-lane major arterial, and realignment of Tyler Street on both the east and west side of SR-86. The project would also improve public safety and mobility by constructing another new bridge spanning over Coachella Valley Stormwater Channel (CVSC), replacing the existing low water crossing, and eliminating flood-related hazards during inclement weather events.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete