FM 148 Bypass

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.


PROJECT STATUS
COMPLETE
COMPLETION DATE
Jun 03 2019
2 OUT OF 3
ENVIRONMENTAL REVIEW
AND PERMITTING PROCESSES COMPLETED
SECTOR
Surface Transportation
CATEGORY
DOT Projects
LEAD AGENCY
States
Description: 

The proposed project involves construction of a new location rural roadway connecting FM 148 with US 175, a distance of approximately 1.6 miles.

The proposed roadway would construct a two-lane facility consisting of two 12-foot wide travel lanes (one in each direction) with 8-foot outside shoulders, and turn lanes. The proposed FM 148 Bypass at its southern terminus would require changes to approximately 1,927 linear feet of existing FM 148 just east of the City of Crandall. At its northern terminus, the proposed project would have at-grade connections with US 175 frontage roads, improvements to which have been proposed by others. Approximately 3,850 feet of US 175 would be reconstructed to create an overpass crossing of the FM 148 Bypass. The FM 148 roadway would have a ROW of 164 feet to 230 feet in width to incorporate a left turn lane. Other construction activities would include drainage improvements to manage water crossings of the proposed roadway. The proposed project would require approximately 33.0 acres of proposed ROW and 2.2 acres of proposed permanent drainage easements. 

 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.

To view Timetable chart, please turn device sideways (landscape)

Overall Project Timetable
STATUS
Schedule
Extension
Ahead of Schedule
Paused

*Planned dates are not represented in the timetable above.

Action Information

For additional information, please select an Action from the Permitting Timetable above.

Action:
Responsible Agency:
Bureau:
Action Status:
SHPO:
Action Identifier:
Action Outcome:
Milestone
Original Target Date
Current Target Date
Milestone Complete