(TX) FM 676 and Mile 5 (From SH 107 to Taylor Road)

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
DOT Projects

Texas

LEAD AGENCY
Texas

Description:

The scope of the proposed project is to widen FM 676 and Mile 5 to an 82-foot-wide urban
type facility consisting of four 12-foot-wide travel lanes, two 10-foot-wide shoulders, a 14-
foot-wide continuous left turn lane, and five-foot-wide sidewalks on both sides of the
roadway within a proposed 100-foot-wide ROW.