(TX) East Loop (Old SH 32)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/01/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The Cameron County Regional Mobility Authority (CCRMA), Cameron County and in cooperation with the Texas Department of Transportation-Pharr District (TxDOT), is proposing to construct a new overweight Truck Corridor from IH-69E near the Veterans International Port of Entry at Los Tomates to SH 4 Port Connector Road, south port entry. A distance of 11.1 miles in south-eastern Cameron County, Texas. Once the roadway is constructed it would be named East Loop (SH 32).
The proposed roadway would provide for variable roadway widths consisting of a four-lane divided roadway with shoulders in some sections to a six-lane divided roadway with shoulders in other sections. In addition, a roadway overpass would be constructed at the intersection of SH 4 and FM 1419. East Loop would utilize portions of existing roadway rights-of-way when possible such as East Avenue, FM 1419 and SH 4 and in other sections would be entirely on new location. Once constructed portions of East Avenue, FM 1419, and SH 4 would be re-designated as East Loop.
The proposed improvements would require an additional 249.8 acres of new roadway right-of-way. In addition to the roadway a shared use (pedestrian and bicycle) path is proposed for the project in the urban (curb and gutter) sections of the roadway. Bicycles would use the roadway shoulders and a 5 ft sidewalks would be provided for pedestrians in the rural open ditch sections.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|