Will be determined in the Record of Decision (ROD). When complete, the ROD will be posted on the website noted above.
None.
Refer to website noted above.
Refer to website noted above.
Will be determined in the Record of Decision (ROD). When complete, the ROD will be posted on the website noted above.
None.
Refer to website noted above.
Refer to website noted above.
To be posted by lead agency
Link to NMFS MMPA ITA website for Sunrise Wind (which has links to the ITA Application, supporting documents, and FR notices such as the NOR, etc): https://www.fisheries.noaa.gov/action/incidental-take-authorization-sunrise-wind-llc-construction-and-operation-sunrise-wind
N/A
N/A
See link to MMPA ITA information above.
No actions taken by NMFS at this time.
BOEM has posted the FIN.
None at this time.
None at this time.
NA
FWS has no project-related public events.
None at this time.
Provided by lead agency
N/A
BOEM has posted the FIN.
None at this time.
None at this time.
N/A
NPS has no project-related public events.
None at this time.
Posted by lead agency
Posted at this link when available:
Outer Continental Shelf permit: https://www.epa.gov/caa-permitting
CWA 402 (NPDES): https://www.epa.gov/npdes-permits
N/A
No EPA litigation information at this time
Posted at this link when available:
Outer Continental Shelf permit: https://www.epa.gov/caa-permitting
CWA 402 (NPDES): https://www.epa.gov/npdes-permits
Posted at this link when available:
Outer Continental Shelf permit: https://www.epa.gov/caa-permitting
CWA 402 (NPDES): https://www.epa.gov/npdes-permits