Official US Government Icon

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.

Secure Site Icon

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Roseau Municipal Airport Development Project, Environmental Assessment

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled icon

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Aviation icon

SECTOR
Aviation

CATEGORY
DOT Projects

Department of Transportation icon

LEAD AGENCY
Department of Transportation, Federal Aviation Administration

Description:

THIS PROJECT IS CATEGORICALLY EXCLUDED. AN ENVIRONMENTAL ASSESSMENT IS NO LONGER BEING PREPARED.

 

Seal Coat Runway 16-34, Taxiways, Access Road (approx. 61,000 square yards)

• Rehabilitate Connecting Taxiway A: Mill & Overlay (approx. 2,800 square yards)

• Crack Seal Runway 16-34, Taxiways, Taxilanes, Apron, Access Road (approx. 79,000 square yards)

Construct Aircraft Parking Apron (approx. 9,900 square yards)

• Construct Connecting Taxiways (approx. 3,500 square yards)

• Remove Aircraft Parking Apron (approx. 6,200 square yards)

• Remove or Relocate Two Aircraft Storage Hangars (approx. 9,000 square feet total)

Remove Natural Growth Airspace Obstructions (approx. 29 acres of trees)

• Remove and Relocate Man-Made Airspace Obstructions (i.e. poles, fencing)

• Install Medium Intensity Approach Lighting System with Sequenced Flashers (MALSF)

• Construct MALSF Access Road (approx. 1,900’ x 20’)

• Replace Runway 16-34 Airfield Lighting (Precision Approach Path Indicator Lights, Runway End

Identifier Lights, Medium Intensity Runway Edge Lights, Airfield Guidance Signs) and Electrical Building

Construct Arrival/Departure Terminal Building (approx. 1,300 square feet)

• Construct Site Utilities (electric, septic, water, natural gas)

• Construct Terminal Area Fencing (approx. 1,800 linear feet)

• Construct Access Road & Parking Lot (approx. 2,000 square yards

Remove Existing & Construct New Above-Ground Fuel Facility (16,000 gallons total)

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete