Dow Chemical Company's Harris Reservoir Expansion EIS
PROJECT WEBSITE: https://www.swg.usace.army.mil/Business-With-Us/Regulatory/Special-Projects-Env…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/20/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Water Resources
CATEGORY
Project Category
Other Projects
LEAD AGENCY
Department of the Army, US Army Corps of Engineers - Regulatory
Description:
The Corps Galveston District prepared an environmental impact statement (EIS) for the proposed Harris Reservoir Expansion Project (Project) located in Brazoria County, Texas. The proposed Project would include the construction of a 1,929-acre impoundment with a nominal storage capacity of 50,000 acre-feet, an intake and pump station to divert Dow’s existing surface water rights from the Brazos River, an outlet to Oyster Creek, and an emergency spillway. The Project would also include floodplain enhancements on Oyster Creek, stream restoration, and temporary construction staging and laydown areas. The proposed Project site is located between the Brazos River and Oyster Creek approximately 8 miles northwest of the City of Angleton in Brazoria County, Texas.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|