I-10 Wildwood Canyon Road Interchange Project
PROJECT WEBSITE: https://yucaipa.org/wildwoodcanyonrdinterchange/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
							ENVIRONMENTAL REVIEW AND PERMITTING STATUS
							IN PROGRESS
						
																																				ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
																																10/01/2026
																					
							ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
							COMPLETED
						
								SECTOR
								Surface Transportation
							
							CATEGORY
																						
								Project Category
              DOT Projects
																				
								LEAD AGENCY
																	California, CalTrans
															
Description:
The California Department of Transportation (Caltrans) in cooperation with the the City of Yucaipa and San Bernardino County Transportation Authority (SBCTA), is proposing to establish a new interchange connection on Interstate 10 (I‐10) at Wildwood Canyon Road, between the Live Oak Canyon Road/Oak Glen Road Interchange and the County Line Road Interchange, in City of Yucaipa, County of San Bernardino, California.
The I‐10 Wildwood Canyon Road Interchange Project (Project) would provide improved access to and from I‐10 and accommodate future development. Associated improvements for the Project include new connecting roadways and/or realignment of existing local roadways, overcrossing bridge structures, signage, and the protection or relocation of utilities. The Wildwood Safety Roadside Rest Area would remain in place.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
 
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
 - Responsible Agency:
 - Bureau:
 - Action Status:
 - SHPO:
 - Action Identifier:
 - Action Outcome:
 
| Milestone | Original Target Date | Current Target Date | Milestone Complete | 
|---|