Copper Creek Exploration Project

PROJECT WEBSITE: ePlanning Project Page

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
01/08/2026

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Mining

SECTOR
Mining

transparency icon

CATEGORY
Project Category FAST-41 Transparency Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Bureau of Land Management

Description:

This project is posted in the interest of transparency and response to Executive Order 14241. 

The project sponsor has proposed the Copper Creek exploration project which includes exploration drilling activities within the Copper Creek Mining District (also referred to as the Bunker Hill Mining District), within Pinal County, Arizona. The drilling activity consists of 67 drill pads within less than 200 acres. Existing roads and infrastructure will be utilized for the exploration activities. The drill pads and roads encompass approximately 18 acres, which includes six (6) acres for 67 drill pad sites and 12 acres for associated access roads. A total of 14 acres of which will be reclaimed before the Project is completed. The remaining four (4) acres consist of road widening disturbance (from 8 to 12 feet wide) and would not be reclaimed following completion of work. The Project Area is adjacent on all sides to undeveloped land that includes lands owned or managed by the BLM; private parties, including applicant's patented claims, and the Arizona State Land Department.

The Project would occur within the Copper Creek Mining District (also referred to as the Bunker Hill Mining District), where mineral exploration and extraction has previously occurred. The Project will specifically use existing access roads and pads that were previously constructed for mineral exploration activities, with many of the access roads currently in use. The Project Sponsor proposed to conduct exploration activities that will cause some surface disturbance of this previously disturbed area, with some minor expansion in specific areas, primarily to allow safe access. This disturbance will allow for further data collection to assess mineral development potential within the Project Area.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete