Angel Island

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/07/2028

0 out of 3

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Mining

SECTOR
Mining

transparency icon

CATEGORY
Project Category FAST-41 Transparency Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Bureau of Land Management

View Postings by Agencies

Description:

Angel Island is a development stage lithium project located in Clayton Valley in Esmeralda County, NV. Angel Island is located on BLM-administered public lands and includes existing and authorized disturbance associated with Notice NVNV105858926. The project is initiated by Cypress Holdings (NV), Ltd., a wholly owned subsidiary of Century Lithium Corp.

Lithium is contained within a mudstone unit and three zones of a claystone unit. The deposit is essentially flat-lying with minimal to no overburden. Mining will be accomplished by ripping the ore, loading into trucks or onto an in-pit conveyor and transporting to the processing facility via either trucks or an in-pit conveyor system. No drilling and blasting is anticipated. Other facilities, in addition to the open pit, would include an overburden stockpile, a low-grade ore stockpile, a dry-stack tailings storage facility, roads, a warehouse and office, a shop, a lab, and a processing/leaching facility.

At the projected annual mill feed of 5.5 million tons, the daily operating rate is 15,000 tons/day. Due to the flat-lying nature of the deposit and the minimal overburden, the stripping ratio is <0.3:1 (overburden to feed/ore). At these production rates, estimated lithium carbonate extraction is 27,400 tons per year.

This project is posted in the interest of transparency and response to Executive Order 14241.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete