North-South Project

PERMITTING DASHBOARD PROJECT POSTING DATE: SEPTEMBER 22, 2016

PROJECT WEBSITE: http://www.cpuc.ca.gov/environment/info/ene/n-s/northsouth.html

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Pipelines

SECTOR
Pipelines

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of Agriculture

LEAD AGENCY
Department of Agriculture, US Forest Service

Description:

5/1/2017 - This project has been cancelled. The California Public Utilities Commission (CPUC) denied the proponent’s (SoCalGas) application on July 14, 2016 based on lack of need for the proposed pipeline. As a result, SoCalGas withdrew their Federal application on August 8, 2016 and the Forest Service is withdrawing the notice of intent to prepare an Environmental Impact Report/Environmental Impact Statement.

Issuance of a new special use authorization for the construction, operation, and maintenance of a 36 inch natural gas transmission pipeline within West-Wide Energy Corridor #108-267 (Cajon Pass).

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.