New Amalga Gold Project

PERMITTING DASHBOARD PROJECT POSTING DATE: JULY 30, 2026

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/26/2030

0 out of 6

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Mining

SECTOR
Mining

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of Agriculture

LEAD AGENCY
Department of Agriculture, US Forest Service

View FAST-41 Postings by Agencies

Other Agencies with Actions or Authorizations:

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

The New Amalga Gold Project is located within the Tongass National Forest in southeast Alaska, approximately 25 miles north of Juneau and four miles east of Glacier Highway. The project includes underground extraction of gold ore, sorting, and transport of ore on a mine access road to be developed. The mine access road consists of an approximately 4-mile single-lane gravel road to be developed through State of Alaska land and the Tongass National Forest, leading to an approximate 30-acre surface facilities site. This site will host infrastructure such as equipment shops, electrical generation, water treatment plants, ore sorting facilities, and temporary rock staging pads.

The underground mining method will selectively target gold ore veins, and the mined-out voids will be progressively backfilled utilizing cemented waste rock generated from mine development and from ore sorting. The project will not have on-site mine processing of extracted materials. 

Ore will be mechanically sorted and loaded into containers and trucked over the mine access road and Glacier Highway to Cascade Point, a privately-owned parcel where a barge dock will be developed to enable gold ore transport off-site. No mine tailings will be stored at the site, and no tailings dams or tailings landfills will be constructed.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete