Atolia Tungsten Project
PERMITTING DASHBOARD PROJECT POSTING DATE: NOVEMBER 18, 2026All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PLANNED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
PENDING
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Mining
CATEGORY
Project Category
FAST-41 Covered Projects
LEAD AGENCY
Department of the Interior, Bureau of Land Management
View FAST-41 Postings by Agencies
Description:
The Atolia Tungsten Project is located in the historic Rand Mining District of southeastern California, in San Bernardino County, approximately 23 miles south of Ridgecrest, California. The Project encompasses Bureau of Land Management (BLM) administered federal lands and private patented mining claims. The Atolia Tungsten Project will establish domestic production capability for tungsten, with gold as a by-product. The Project comprises two independent placer deposits, Black Hawk and Spud Patch, each with its own scheelite concentration plant, together with an on-site ammonium paratungstate (APT) refinery.
The Black Hawk deposit, near Red Mountain, will be mined through a four-phased open pit. The Spud Patch deposit, near Atolia, will be mined through a two-phased open pit. The proposed mill sites for both deposits are located on private land adjacent to each pit, and dewatered mill tailings will be backfilled into the mined-out pits.