Atlantic Shores North

PERMITTING DASHBOARD PROJECT POSTING DATE: SEPTEMBER 02, 2022

PROJECT WEBSITE: Atlantic Shores Offshore Wind

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

0 out of 11

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Renewable Energy Production

SECTOR
Renewable Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of the Interior

LEAD AGENCY
Department of the Interior, Marine Minerals Administration

View FAST-41 Postings by Agencies

Other Agencies with Actions or Authorizations:

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of War Seal

Department of War, US Army Corps of Engineers - Civil Works

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Environmental Protection Agency

Environmental Protection Agency

Description:

Atlantic Shores Offshore Wind, LLC (“Atlantic Shores”) proposes to construct, operate, and maintain the Atlantic Shore North Project (the “Project”; “Atlantic Shores North”), an offshore renewable wind energy facility in Lease Area OCS-A 0549, which is approximately 7.8 statute miles (mi) (12.6 kilometers [km]) from the New Jersey (NJ) shoreline and approximately 60 miles (96.6 km) from the New York State (NY) Coast.

The Lease Area layout is designed to maximize offshore renewable wind energy production while minimizing effects on existing marine uses. The structures will be aligned in a uniform grid with multiple lines of orientation allowing straight transit through the Lease Area. Within the Lease Area, the WTGs and OSSs will be connected by inter-array cables and/or inter-link cables. Energy from the OSSs will be delivered to shore by buried export cables that will be located within designated Export Cable Corridors (ECCs) from the Lease Area through Federal as well as New Jersey and/or New York State waters to landfall sites on the New Jersey and/or New York coastlines.

Atlantic Shores will use horizontal directional drilling (HDD) technology to install the export cables from the end of the ECCs to the landfall sites to minimize impacts to the intertidal and nearshore habitats and ensure stable burial of the cables. From each landfall site, the onshore interconnection cables will travel underground primarily along existing roadways and utility rights-of-way (ROWs) to new or existing onshore substation and/or converter station sites.

The Executive Director granted a Bureau of Ocean Energy Management request to extend the COP, NEPA, Section 106, ESA, EFH, MMPA, Section 10/404, Section 408, NPDES, and OCS Air Permit completion dates on January 2, 2025. The Executive Director determination is posted here.

On April 25, 2025, Atlantic Shores Offshore Wind, LLC (“Atlantic Shores”) requested a pause in all milestones and associated deadlines in the FAST-41 permitting dashboard schedule for the Atlantic Shores North Project (Lease OCS-A 0549) (the “Project”) for a period of 9 months, through January 26, 2026, subject to further extension. This pause of the permitting dashboard schedule for the Project is necessary because the January 20, 2025 Presidential Memorandum titled “Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects” created delays in agency approvals and are expected to continue to do so for an unknown period of time, making it not reasonably feasible for Atlantic Shores to continue with key deliverables required by the current FAST-41 permitting timetable. The requested pause is necessary to provide Atlantic Shores the time needed to ascertain the full impact of the Presidential Memorandum before incurring additional costs to perform the wide variety of development activities that would otherwise have to take place during the period of the requested pause.

On January 12, 2026, Atlantic Shores Offshore Wind, LLC and Atlantic Shores Offshore Wind Project 3, LLC (“Atlantic Shores”) requested a pause extension to their initial pause in all milestones and associated deadlines in the FAST-41 permitting dashboard schedule for the Atlantic Shores North Project (Lease OCS-A 0549) (the “Project”) for a period of 270 days (9 months), through October 23, 2026. This pause of the permitting dashboard schedule for the Project is necessary because the circumstances requiring the initial extension remain in place.  Delays in agency approvals and are expected to continue for an unknown period of time, making it not reasonably feasible for Atlantic Shores to continue with key deliverables required by the current FAST-41 permitting timetable. The requested pause extension is necessary to provide Atlantic Shores the time needed to ascertain the full impact of the January 20, 2025, Presidential Memorandum before incurring additional costs to perform the wide variety of development activities that would otherwise have to take place during the period of the requested pause.

On October 16, 2026, Atlantic Shores Offshore Wind, LLC and Atlantic Shores Offshore Wind Project 3, LLC (“Atlantic Shores”) requested a pause extension for all milestones and associated deadlines in the FAST-41 permitting dashboard schedule for the Atlantic Shores North Project (Lease OCS-A 0549) (the “Project”) for a period of two-years, through October 22, 2028. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete