Warrenton-Astoria Regional Airport/Astroia Regional Airport Taxiway A West and Main Apron Improvements, Environmental Assessment

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/15/2018

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Aviation

SECTOR
Aviation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Aviation Administration

Description:

The project is necessary because the existing taxiway is at an angle to the runway rather than parallel. This violates specific FAA airport design safety standards. The project will correct the non-compliant configuration by making the last 1,000 feet of taxiway parallel to the runway, providing a holding apron, and providing a connector taxiway that connects to the end of the runway at a 90-degree angle. The project thus replaces the current angled taxiway adjoining Runway 8-26 with a parallel taxiway separated from the runway. The project will involve installation of 2.29 acres of new pavement, removal of 1.99 acres of existing pavement in an area to be restored to mown grass Runway Safety

Areas (RSA), and will retain and reconstruct 0.68 acres of pavement.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete