Waiale Road Extension Project
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
Project was downscoped to CE and, therefore, cancelled in Dashboard.
Two (2) through lanes, shoulder bikeways, pedestrian sidewalks, a shared use path on the west (mauka) side of the roadway extension, drainage improvements, installation of underground utilities (e.g. potable water mainlines, gravity and forcemain sewerlines, reclaimed (R1) waterlines, drainlines, electrical ducts, and associated appurtenances), and grassy swales to lessen the impact of stormwater pollution. The proposed project also contemplates four (4) intersections, which will each be evaluated for various treatments including potential roundabouts, signalization or other traffic controls.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|