U.S. Route 58/220 Bypass to North Carolina State Line Limited-Access Study
PROJECT WEBSITE: Martinsville Southern Connector Study
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The Virginia Department of Transportation is evaluating potential transportation improvements along the U.S. Route 220 corridor between the U.S. Route 58/220 Bypass and the North Carolina state line. The Martinsville Connector Study is a first step toward identifying future improvements to the Route 220 corridor within its study limits, and will focus on a potential limited access road on a new location and/or will look at potential new improvements to Route 220.
The area for study generally covers Route 220 between Route 58 and the North Carolina state line. The specific geographic limits will be determined and refined through the course of the study.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|
Environmental and Community Outcomes
Design commitments for the Belleview and Marrowbone plantations include avoidance of encroachment on the properties per the NRHP nomination (Belleview) and the boundaries as depicted in the Virginia Cultural Resource Inventory System (VCRIS). The PA includes VDOT’s commitment to avoid encroaching on the boundaries of the Patterson, Price, and Watkins cemeteries as identified in VCRIS.