US 51 I-39/90 - US 12/18 (Beltline); Stoughton - McFarland
PROJECT WEBSITE: US 51 Corridor Study (Stoughton-McFarland)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
Study to evaluate long-term transportation needs in the US 51 corridor between the cities of Madison and Stoughton, Wisconsin. The Tier 1 study is intended to identify a corridor for eventual transportation improvements that may include capacity expansion and re-routing US 51 out of downtown Stoughton.
The FHWA and Wisconsin Department of Transportation (WisDOT) will no longer prepare a Tier 1 EIS for the US 51 corridor in Dane County, Wisconsin generally between Interstate 39/90 east of the City of Stoughton and US 12/18 (Madison South Beltline Highway) because funding to complete improvements to be considered would not be available in the foreseeable future. Notice to Rescind a Notice of Intent for an Environmental Impact Statement published on FR on December 19, 2016.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|