University Lake Drive Improvements

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Alaska

LEAD AGENCY
Alaska

Description:

The Alaska Department of Transportation and Public Facilities (DOT&PF). In cooperation with the Municipality of Anchorage (MOA) and Alaska Pacific University (APU), proposes a project lo upgrade and extend University Lake Drive to the northeast to connect to University Drive (a distance of approximately 0.5-mile) in Anchorage. Alaska (Figure I).

The proposed project includes:

•              Construction of approximately 0.5-mile of road 011 a new alignment (undeveloped land adjacent to the existing University Lake Drive cul-de-sac).

•              Construction of an at-grade access to University Lake Drive

•              Pedestrian improvements

•              Drainage improvements (i.e. storm drain installation. ditching)

•              Utility and lighting improvements

•              Clearing and grubbing vegetation