University Boulevard Extension

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
08/31/2028

2 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Other Agencies with Actions or Authorizations:

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Description:

The project would extend University Boulevard from Devlin Road to Wellington Road for approximately 2.5 miles and would be four lanes wide. At the north end of the project, the existing portion of University Boulevard would be widened from a two-lane undivided roadway to a four-lane, divided one (from approximately 650 feet south of the existing intersection of Wellington Road and University Boulevard to the southern entrance to Gainesville High School on University Boulevard). The new four-lane divided section would be built south from the southern entrance to Gainesville High School to the existing three-legged intersection of Devlin Road and University Boulevard, with intersection improvements as needed to accommodate the extension. The project would also include a 5-foot sidewalk on the west/south side of the roadway and a 10-foot shared use path on the east/north side. Additionally, turn lanes would be provided at specific locations, in coordination with existing and planned adjacent developments.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete