Transportation Improvements to a section of Interstate 11 (I-11/US Highway 95 (US 95)/US Highway 93
PROJECT WEBSITE: https://ndotdap.com/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
NDOT, in coordination with FHWA, is preparing an EIS to evaluate potential improvements to address aging bridges and provide reliable travel along a 4-mile-long segment of Interstate 11 (I 11)/U.S. Highway 95 (US 95)/U.S. Highway 93 (US 93). The project is referred to as the Downtown Access Project (DAP). The study area is in the City of Las Vegas and Clark County, Nevada extends from the freeway between Rancho Drive and Mojave Road that has aging infrastructure and worsening congestion for current and projected (2050) travel demand, which contributes to longer travel times. A key roadway deficiency is the condition of the 1.6-mile-long Las Vegas Viaduct that carries the freeway over the Union Pacific Railroad tracks and several local streets and parking lots.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|