Ted Stevens Anchorage International Airport Field Maintenance Storage Yard Expansion, Environmental Assessment

PROJECT WEBSITE: http://dot.alaska.gov/creg/aia-storage-yard-expansion/

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/01/2018

1 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Aviation

SECTOR
Aviation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Aviation Administration

Description:

The Alaska Department of Public Transportation & Public Facilities (DOT&PF) is proposing to expand the existing Airport Field Maintenance (AFM) Storage Yard located on the south side of Lake Hood Drive and the west side of Helio Place at the Ted Stevens Anchorage International Airport (TSAIA). The AFM Storage Yard expansion would be utilized as a storage yard for Airport operations primarily to store supplemental and backup equipment, materials for ongoing operations, and as a temporary laydown area for construction projects and for temporary materials stockpiling. The expansion would require approximately 16 acres of ground disturbance which includes 7.7 acres wetlands impacts (fill).

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete