USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

State Route 1: Santa Maria River Bridge Replacement

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/25/2020

3 out of 3

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation (Caltrans) proposes to replace the Santa Maria River Bridge (No. 49-0042) on State Route 1 (SR-1) at PM 50.3/50.6 in Santa Barbara County and at PM 0.0/0.3 in San Luis Obispo County. The Santa Maria River Bridge crosses the boundary of Santa Barbara County and San Luis Obispo County. 
As mentioned, the proposed project will occur on SR-1 in both northern Santa Barbara County and southern San Luis Obispo County. The bridge is located just north of the City of Guadalupe in Santa Barbara County. The 1,200 feet long bridge was built in 1955 and was seismically retrofitted in 1998. The existing bridge sections consist of two 12-foot lanes, two 2-foot shoulders and two 32-inch wide curbs supporting metal bridge rails. Multiple bridge inspections have determined that the bridge’s structural integrity has deteriorated and action is required to protect the traveling public. Temporary access will be required for bridge work and for work in the river. Vegetation removal will also be required. Construction equipment will need to operate in the riverbed.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete