SR88 Pavement Anchor Project
PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-10/district-10-current-projects/10…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
09/13/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes to to repair roadway pavement, comply with Americans with Disabilities requirements, and replace sign elements.
.The project would also include:
- Overlay the full width of the roadway from PM 5.1 to PM 6.5 and PM 9.5 to PM 16.4 with 0.2 ft Rubberized Hot Mix Asphalt (RHMA).
- Cold plane 0.2 ft of asphalt from PM 6.5 to PM 9.5 and resurface the entire width with 0.2 ft RHMA.
- Widen the intersections at Harney Lane and Kettleman Lane to accommodate the STAA truck-turn movements.
- Increase the length of the acceleration lane at SR12/SR88 intersection on the east bound right merge lane to improve the operation.
- Install centerline rumble strip from PM 5.1 to 12.0 and install centerline and edge rumbles strips from PM 15.5 to 16.4.
- Include various TMS elements and two Maintenance Vehicle Pullouts (MVP) at PM 11.3 and 13.45
- Upgrade roadside signs and replace dikes.
- Upgrade existing guardrails and install two new guardrails at PM 11.3 and 13.45.
- Install/upgrade ADA elements in Lockeford including, but not limited to, sidewalks, driveways, curb ramps and detectable plates.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|