SR-91 Central Ave to Acacia Court Improvement Project
PROJECT WEBSITE: https://www.metro.net/projects/i-605-corridor-hot-spots-program/SR-91-early-act…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
07/08/2021
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
Caltrans, in cooperation with the Los Angeles County Metropolitan Transportation Authority
(Metro), and Gateway Cities Council of Governments (GCCOG), proposes to improve a portion
of the State Route 91 (SR-91) corridor between Central Avenue and Acacia Court located in the
City of Compton and the City of Carson and one overhead sign located near Long Beach
Boulevard within the City of Long Beach in Los Angeles County, California.
The proposed project improvements include a Collector-Distributor (C-D) road with a concrete-barrier-separated system that would run parallel to the SR 91 mainline in each direction, connecting Central Avenue and Wilmington Avenue on- and off-ramps. The C-D road would consolidate multiple access points from the Central Avenue, Wilmington Avenue and Acacia Court interchanges into a single access point, halving the number of ingress/egress points on the freeway mainline and redirecting the short and nonstandard weaving areas from the freeway mainline to the C-D road.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|