SM 101 Cordilleras Creek Bridge Replacement
PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmenta…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/24/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes to replace the existing Cordilleras Creek Bridge (Bridge #35-0019) located on United States Highway 101 at post mile (PM) 7.13 in the City of Redwood City in San Mateo County. The project is near the boundary of the City of San Carlos. The purpose of the project is to maintain connectivity and a safe highway facility for the traveling public along U.S. 101 by replacing the existing deteriorated bridge over Cordilleras Creek. The existing bridge is at the end of its service life and in need of replacement.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|