Shoshone Drainage; Replace and enhance culvert systems
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/18/2018
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Department), as assigned by the Federal Highway Administration (FHWA), is the lead agency under the National Environmental Policy Act (NEPA). The Department is the lead agency under the California Environmental Quality Act (CEQA). The existing culvert system at State Route (SR) 178, post mile 43.4, in Inyo County, CA (Figure 1) contains two separate drainage systems (OS 1 and OS 2) to accommodate the two main drainage paths within the Amargosa River channel. The westernmost culvert (DS1) is located at PM 43.39, and the eastern culvert location (OS2) is located at PM 43.44 (Figures 2-4). A survey of the existing culverts has determined that the culverts have exceeded their recommended 25 year design service lives, and due to sediments deposited by the river are only operating at 25%-50% of their original capacity. This project proposes to replace both sets of culverts (OS1 and DS2) with pre-cast concrete box culverts to increase hydraulic capacity and reduce the frequency of water overtopping the highway.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|